X
O uso deste material é autorizado apenas para fins editoriais.
Poxa! Sua busca não encontrou nenhum resultado
Mas não se preocupe. Talvez outros temas semelhantes possa te interessar
Visite nossa página inicial para encontrar outros resultados
A sua busca obteve 44 resultados
Petrobras brings forward start of production of Búzios 8 (P-79)
Published on May
Petrobras brings forward start of production of Búzios 8 (P-79) Unit incorporates advances in energy efficiency P-79 is the eighth platform in the Búzios field Press Photo / Petrobras P-79 is the...
Petrobras platform P-79 arrives at the Búzios field
Published on Feb
Petrobras platform P-79 arrives at the Búzios field Unit is capable of producing 180,000 barrels of oil and compressing 7.2 million m³ of gas per day Petrobras platform P-79 arrives at the Búzios...
Petrobras starts production at Búzios 6
Published on Jan
Petrobras starts production at Búzios 6 The FPSO P-78 can produce up to 180,000 barrels per day and will increase the gas supply. A FPSO P-78 é a sétima plataforma em operação no campo de Búzios,...
Petrobras begins contracting for the construction of FPSO Búzios 12
Published on Oct
Petrobras begins contracting for the construction of FPSO Búzios 12 New production vessel will consolidate Búzios as Petrobras' largest producer and serve as a hub for exporting natural gas...
Petrobras announces production record of FPSO Almirante Tamandaré (Búzios 7) FPSO Almirante Tamandaré Press Photo SBM Offshore FPSO Almirante Tamandaré is part of the Búzios 7 Project, which...
Petrobras platform P-79 departs South Korean shipyard en route to Brazil Unit is capable of producing 180,000 barrels of oil and compressing 7.2 million m³ of gas per day The P-79 floating...
Petrobras posterga prazo de recebimento de propostas para o FPSO do projeto de revitalização de Albacora
Published on Nov
Petrobras posterga prazo de recebimento de propostas para o FPSO do projeto de revitalização de Albacora Navio-plataforma no mar André Ribeiro / Agência Petrobras Data de recebimento de propostas...
FPSO P-78 arrives at the Búzios Field
Published on Sep
FPSO P-78 arrives at the Búzios Field The platform was towed to the site with the crew onboard, a strategy that allows for an earlier start of production and enhances operational reliability...
Do a search:
Search suggestions
Most searched
Fuel price
Pre-salt
Team Petrobras
Choose a channel:
Accessibility:
Language:
Select a language:

